• Restored a 2 mile long, 100-year-old water main wwith minimal disruption • Successfully lined despite adverse conditions, such as multiple trapezoid sweeps
• Lined 230 feet of 3- and 4-inch underground steam condensate return piping in just two working days • Used proprietary SIPP method, which other companies had been unable to provide
• Lowered outside temperature of piping system by applying a coating to the inside of the piping system • Significantly increased system insulation values, remarkably increasing efficiency
• Over 2000 feet were lined within 3 weekends with no disruptions to any tenants in this 45 story building.
Process was approximately 75% less than replacement, saving the owners millions of dollars.
• Fixed approximately 150 feet of 6 inch drain piping without digging during off peak weekend hours • Despite encountering a different piping layout than the blueprints showed, completed the job on time and on budget
• Cleaned 500 feet of cast iron drainage pipes ranging from 3" to 6" in diameter • Completed 4 drain pipes, in overnight shifts with no disruption to tenants or retail space